Sam Houston Tollway (SE) Widening: Beamer to Blackhawk, Pearland, TX


Sam Houston Tollway (SE) Widening: Beamer to Blackhawk, Pearland, TX
Client: Harris County Toll Road Authority (HCTRA)

This project provided for the widening of 2.5 miles of 4-lane tollway to 8 lanes from Pearland Parkway to Blackhawk. IDCUS, as the project manager, provided a full service design team for roadway, drainage, and structural design services, field surveys, and geotechnical investigation for this project. Scope of work included updating schematics, performing final design, and preparing PS&E to Harris County Toll Road Authority and TxDOT design standards. IDCUS’s services include designing and/or managing design of roadway and bridge widening, reconstruction of ramps, storm water drainage improvements, traffic control plans, storm water pollution prevention plans, bridge reconstruction, new retaining walls, preparing specifications list and general notes, and estimating quantities and preparing cost estimates.