Featured Projects
County Engineering & Design
Crabb River Road Improvements
Fort Bend County, Texas
PROJECT COST: $40M
Project extended from US 59 & SH 99 to west on FM 2759 heading east to FM 762 along south side of cities of Sugar Land, Rosenberg, & Thompsons. LGPP project included widening of 3 miles of existing Crabb River Rd from 2 & 3-lane asphalt pavement to 4-lane divided roadway with raised median, concrete pavement, storm sewer, detention ponds, & signing/pavement markings. Included planning, alternative analysis, preliminary engineering, schematics, ENV assessment, ROW mapping, geotech, drainage study, public involvement, & agency coordination.
Mueschke Road Widening & Extension
Harris County, Texas
PROJECT COST: $12M
Project widened Mueschke Rd from existing 2-lane rural roadway with open ditches to 4-lane curb & gutter urban roadway with raised median following Harris County design criteria. Drainage analysis identified existing drainage patterns, quantified flow rates for different rainfall events, & proposed best practice solutions for mitigating impact of roadway widening, including detention facilities & storm sewer trunk line sizes. South segment drainage is connected to existing system stub-out south of Bauer Hockley Rd and north segment drains to HCFCD Ditch.
Hufsmith–Kohrville Road Widening
Harris County, Texas
PROJECT COST: $5.2M
Project consists of 1.3 miles of widening of Hufsmith–Kohrville from 500’ north of Holderrieth Road to 500’ south of Willow Creek Estates Drive & FM 2920 from 2 to 4 lanes with concrete pavement, storm sewer, and detention ponds. The Hufsmith-Kohrville roadway segments lie within the Willow Creek watershed in NW Harris County. Scope of services will be divided into 3 phases: Study Phase, Design Phase, & Bidding and Award Phase.