Featured Projects
Environmental Studies and Documentation
FM 359: FM 1093/Westpark Tollway to FM 359/Mason Rd
TxDOT Houston
Project will reconstruct and widen existing 8-mile, 2-lane roadway to a 4-lane divided highway with raised median, shoulders, and left-turn lanes at intersections. An environmental study is being prepared to obtain NEPA clearance. Project will consider Environmental aspects including Waters of the US (Wetlands), Floodplains & Floodways, Haz-Mat, Cultural Resources, Community Impacts & Environmental Justice, Air Quality, Traffic Noise, & Threatened & Endangered Species’ Habitats.
US 290: Hempstead to Chapel Hill
TxDOT Houston and Bryan
Prepared Categorical Exclusion, Wetland Delineation, USACE & TCEQ Permits, & Public Involvement for widening of 9.5 mile, 4-to 6-lane roadway within existing ROW. Project includes 5 proposed detention pond sites. Purpose of project is to improve mobility & safety within the corridor. Work includes conducting Public Involvement activities to inform community of proposed highway improvements.
Sam Houston Parkway South
Harris County Toll Road Authority, Houston, TX
This project is for the widening of the toll lanes from 2 to 4 lanes. A traffic noise study was performed at the Las Palmas Apartment Complex. Noise impacts were identified, and noise abatement options were considered. A meeting with the property owners was conducted to present noise wall options. Property owners decided that a noise wall be constructed between their property and the roadway.