Featured Projects

Highway Design and PS&E

North Houston Highway Improvement Project – I-69 Segment 3B (SH 288 to I-45S)
TxDOT Houston
CONSTRUCTION COST: $800M

Final design and PS&E for project that will increase capacity, relieve congestion, and improve mobility, drainage, and safety through the I-69 corridor. IDCUS is providing all phases of design including depressed roadway with retaining walls, traditional and iconic tied-arch bridges, drainage, and pump station for approx. one mile of this proposed section of I-69.

I-20: East of FM 349 to FM 1208
TxDOT Odessa
CONSTRUCTION COST: $250M

I-20 is divided into 5 design segments and is planned to be implemented in 3 construction projects. IDCUS provided the overall I-20 Corridor TCP concept for Segment 5. Scope includes PS&E to reconstruct I-20 main lanes & frontage roads for all segments. IDCUS scope included reconstruction of 6 overpasses at CR 1180, CR 1150, SL 25, BI 20, FM 715, and FM 307; conversion of 2 underpasses to overpasses, as well as intersection reconstruction. The FM 1208 underpass is being reconstructed to add an elevated intersection over UPRR & access ramp to and from I-20.

SH 35: I-45 to Griggs Road, 2 miles
TxDOT Houston
CONSTRUCTION COST: $90M

Project includes constructing 6 new concrete main lanes, dual 2-lane frontage roads, profile adjustments, new bridges over Old Spanish Trail (OST), Wheeler Ave., University Dr., and water crossings over Brays Bayou and Kuhlman Gully. Accelerated the design to meet July 2022 ready-to-let schedule. Performed final design and prepared PS&E to reconstruct and extend existing Spur 5 as a new state highway (SH 35) for approx. 2 miles from I-45 to Griggs Road, just south of I-610.

I-10: Brazos River to Manak Ln., 3 miles
TxDOT Houston
CONSTRUCTION COST: $180M

Reconstruction & widening from 4 to 6 MLs, I-10 Brazos River bridge replacement, new ML grade separation over Chew Rd, reconstruction of MLK Rd bridge over I-10 (providing 18.5’ clearance) & UPRR tracks, frontage road reconstruction including conversion of 2-way to 1-way, traffic control plans (including temporary drainage facilities), drainage system design (storm sewer, culverts, & ditch), pond design, SWP3, retaining walls, ITS, coordination with UPRR (including Exhibit A), utility coordination, and coordination with adjacent projects.

Map data ©2025, Map data ©2025 Google 
Tovar Street Bridge Replacement
TxDOT Laredo
CONSTRUCTION COST: $3M

Replacement of rural off-system bridge – S. Tovar Street at San Diego Creek with improved sidewalks and fences