Featured Projects

Planning and Schematic Design

Map data ©2025, Map data ©2025 Google 
FM 359: FM 362 to FM 1458, 3.5 miles
TxDOT Houston
PROJECT COST: $96M

Scope includes providing preliminary engineering services for development of a design schematic, environmental documents, and studies in support of schematic work, public involvement, data collection analysis, preliminary drainage and impact analysis, conceptual traffic control, traffic projections, traffic engineering and operations including traffic simulations and 3-D modeling, surveying and mapping, and SUE for Fa portion of the FM 359 corridor from FM 1458 in Pattison to FM 362 in Brookshire in Waller County. The project will require additional ROW.

FM 362: FM 359 to FM 529, 6.2 miles
TxDOT Houston
PROJECT COST: $110M

Scope includes providing preliminary engineering services for development of a design schematic, environmental documents, and studies in support of schematic work, public involvement, data collection analysis, preliminary drainage and impact analysis, conceptual traffic control, traffic projections, traffic engineering and operations including traffic simulations and 3-D modeling, surveying and mapping, and SUE for FM 362 from FM 359 to FM 529 in Waller County. The project will require additional ROW.

FM 2759 & FM 762 / Crabb River Road, 4 miles
TxDOT Houston
PROJECT COST: $40M

Scope included planning, alternative analysis, preliminary engineering, preparation of schematics, environmental assessment, ROW mapping, geotechnical investigation, drainage study (H&H), public involvement, and agency coordination. The project included widening existing FM 2759 from 2 lanes to 4 lanes from US 59 approx. 4 miles to the east of BNSF RR & FM 762; then along FM 762 to 500’ south of LCISD.

Map data ©2025, Map data ©2025 Google 
Hardy Toll Road North - Segment 9: BW 8 to I-45 (N. of SH 99), All Electronic Tolling
Harris County Toll Road Authority
PROJECT COST: $4M

Engineering design services include development of: Diagrammatic for up to 3 alternate improvements for identified problem areas which include short-term & long-term improvements; and Schematic layout design for recommended improvements to include short-term & long-term improvements from 2 lanes to 4 lanes. Work consists of data collection & analysis, traffic studies, traffic signalization, and utility investigation.

Map data ©2025, Map data ©2025 Google 
US 290 from FM 1371 to SH 6, 11.6 miles
TxDOT Houston & Bryan
PROJECT COST: $110M

Scope includes preliminary engineering services for development of design schematic, environmental documents and studies in support of schematic work, public involvement, permit procurement, data collection analysis, mitigation, drainage, traffic c engineering and operations (Travel Demand Modeling & VISSIM), surveying, & mapping. Work consists of widening US 290 from 4 lanes to 6 lanes.