Greens Bayou Tributary Preliminary Engineering Report (PER) On-going
Harris County, Texas, HCFCD
- Study area is located about 2 to 4 miles SE of intersection of BW8 & Hardy Toll Road, and north of Aldine Mail Route Rd and consists of approx. 1.76 miles (9,300’) of open channel.
- Proposed improvements will include alternative scenarios that consider channel conveyance improvements, stormwater detention basins, culvert crossing improvements, etc.
- PER includes: Evaluation of existing site conditions; H&H Analysis; Proposed Alternatives & Analysis; Progress Workshop Meetings; and Findings & Recommendations.
- Project Status: PER to be completed by end of November 2024.
Halls Bayou Flood Mitigation Alternative Analysis
Harris County, Texas, HCFCD
Study focuses on HCFCD channels P118-23-00 and P118-23-02 to evaluate alternatives that reduce flood damages within the study area.
Alternative development included a wide range of possible drainage solutions to address existing issues. Alternatives considered:
Grass-lined channel
Concrete-lined channel
Rectangular section channel improvements
Stormwater detention
Storm sewer improvements
Cost-benefit analysis factors include:
Estimated acreage of land inundation
Number of structures in the floodplain
Number of structures flooded
Miles of inundated roadway
Right-of-way (ROW) needs
Utility adjustments
Environmental impacts
Construction cost
Hydraulic and hydrologic (H&H) modeling performed using HEC-HMS and HEC-RAS 2D.
Project will result in a comprehensive comparison of alternatives, with findings and recommendations to support future design and implementation.
Map data ©2025, Map data ©2025 Google
Taylor Gully Channel Conveyance Improvements PER 2021 - 2023
Harris County, Texas, HCFCD
- Project located in NE Harris County, part of Kingwood Drainage Study.
- Evaluated 9 ALTs after HCFCD acquired Woodridge properties including detention basin-only option & combination of detention basin & channel regrading.
- Taylor Gully is tributary to East Fork San Jacinto River, Unit G103-80-00. Objective of project was to increase channel LOS & reduce 100-yr floodplain of Taylor Gully.
- Proposed improvements also allow for construction of local drainage improvements.
- Project Status: Completed 2023.
Map data ©2025, Map data ©2025 Google
Hughes Stormwater Detention Basin Preliminary Engineering Report (PER) 2020 - 2021
Harris County, Texas, HCFCD
- Located at BW8 near Pearland Pkwy within City of Pearland limits.
- Total tract is approx. 100 acres within Clear Creek Watershed. Approx. 20% is wetland.
- Basin is a component of the regional detention basins for Clear Creek intended to mitigate flooding in the watershed.
- Purpose of project is to evaluate various alternatives including dry basin and wet bottom basin options.
- Based on evaluation of 3 ALTs, the ALT with wet bottom detention basin was recommended.
- Part of Clear Creek Channel Conveyance Improvement Project.
- Project Status: PER is finished.
Aldine Westfield Detention Basin Design
Harris County, Texas, HCFCD
EST. CONSTRUCTION COST: $15M
Project located along Greens Bayou at Aldine Westfield, near Beltway 8 and close to George Bush Intercontinental Airport (IAH).
Total project area: approximately 113 acres.
Part of the HCFCD Excavation & Removal Program; excavation activities continued through 2014.
Purpose of the dry basin: provide 1,250 acre-feet of total stormwater storage volume.
Scope included preparation of:
Conceptual Engineering Report
Construction documents for the detention basin
Construction executed in two phases:
Phase I: Southern portion of the site
Phase II: Northern portion of the site
White Oak Bayou Channel Improvements, Final Design & PS&E
Harris County, Texas, HCFCD
EST. CONSTRUCTION COST: $40M
Project involved regrading and widening the bayou bottom and deepening the channel by approximately 2 feet.
Limits: Along White Oak Bayou from W. Tidwell to FM 1960, spanning approximately 12.6 miles.
Final design included:
188 outfall pipes
Retaining walls in 3 specific reaches to minimize right-of-way (ROW) acquisition
Collaborated closely with HCFCD staff to:
Develop wall designs
Prepare preliminary construction cost estimates and schedules
Design timeline was expedited to meet an early construction start date
West Little York Detention Basin (formerly Langham Creek)
Harris County, Texas, HCFCD
EST. CONSTRUCTION COST: $3.5M
Project is located in northwestern Harris County, north of W. Little York Road and west of Hwy 6 along Langham Creek. Project area consists of 3 tracts: Cell #1 north of Langham Creek, Cell #2 south of Langham Creek, and Cell #3 south of Langham Creek to the east. The goal of the project is to excavate as much as possible within the 3 cells for use as storage. Project includes design, bidding, & construction phase services.