Featured Projects

Storm Water Management

Map data ©2025, Map data ©2025 Google 
Greens Bayou Tributary Preliminary Engineering Report (PER) On-going
Harris County, Texas, HCFCD
  • Study area is located about 2 to 4 miles SE of intersection of BW8 & Hardy Toll Road, and north of Aldine Mail Route Rd and consists of approx. 1.76 miles (9,300’) of open channel.
  • Proposed improvements will include alternative scenarios that consider channel conveyance improvements, stormwater detention basins, culvert crossing improvements, etc.
  • PER includes: Evaluation of existing site conditions; H&H Analysis; Proposed Alternatives & Analysis; Progress Workshop Meetings; and Findings & Recommendations.
  • Project Status: PER to be completed by end of November 2024.
Map data ©2025, Map data ©2025 Google 
Halls Bayou Flood Mitigation Alternative Analysis
Harris County, Texas, HCFCD
  • Study focuses on HCFCD channels P118-23-00 and P118-23-02 to evaluate alternatives that reduce flood damages within the study area.

  • Alternative development included a wide range of possible drainage solutions to address existing issues. Alternatives considered:

    • Grass-lined channel

    • Concrete-lined channel

    • Rectangular section channel improvements

    • Stormwater detention

    • Storm sewer improvements

  • Cost-benefit analysis factors include:

    • Estimated acreage of land inundation

    • Number of structures in the floodplain

    • Number of structures flooded

    • Miles of inundated roadway

    • Right-of-way (ROW) needs

    • Utility adjustments

    • Environmental impacts

    • Construction cost

  • Hydraulic and hydrologic (H&H) modeling performed using HEC-HMS and HEC-RAS 2D.

  • Project will result in a comprehensive comparison of alternatives, with findings and recommendations to support future design and implementation.

Map data ©2025, Map data ©2025 Google 
Taylor Gully Channel Conveyance Improvements PER 2021 - 2023
Harris County, Texas, HCFCD
  • Project located in NE Harris County, part of Kingwood Drainage Study.
  • Evaluated 9 ALTs after HCFCD acquired Woodridge properties including detention basin-only option & combination of detention basin & channel regrading.
  • Taylor Gully is tributary to East Fork San Jacinto River, Unit G103-80-00. Objective of project was to increase channel LOS & reduce 100-yr floodplain of Taylor Gully.
  • Proposed improvements also allow for construction of local drainage improvements.
  • Project Status: Completed 2023.
Map data ©2025, Map data ©2025 Google
Hughes Stormwater Detention Basin Preliminary Engineering Report (PER) 2020 - 2021
Harris County, Texas, HCFCD
  • Located at BW8 near Pearland Pkwy within City of Pearland limits.
  • Total tract is approx. 100 acres within Clear Creek Watershed. Approx. 20% is wetland.
  • Basin is a component of the regional detention basins for Clear Creek intended to mitigate flooding in the watershed.
  • Purpose of project is to evaluate various alternatives including dry basin and wet bottom basin options.
  • Based on evaluation of 3 ALTs, the ALT with wet bottom detention basin was recommended.
  • Part of Clear Creek Channel Conveyance Improvement Project.
  • Project Status: PER is finished.
Aldine Westfield Detention Basin Design
Harris County, Texas, HCFCD
EST. CONSTRUCTION COST: $15M
  • Project located along Greens Bayou at Aldine Westfield, near Beltway 8 and close to George Bush Intercontinental Airport (IAH).

  • Total project area: approximately 113 acres.

  • Part of the HCFCD Excavation & Removal Program; excavation activities continued through 2014.

  • Purpose of the dry basin: provide 1,250 acre-feet of total stormwater storage volume.

  • Scope included preparation of:

    • Conceptual Engineering Report

    • Construction documents for the detention basin

  • Construction executed in two phases:

    • Phase I: Southern portion of the site

    • Phase II: Northern portion of the site

White Oak Bayou Channel Improvements, Final Design & PS&E
Harris County, Texas, HCFCD
EST. CONSTRUCTION COST: $40M
  • Project involved regrading and widening the bayou bottom and deepening the channel by approximately 2 feet.

  • Limits: Along White Oak Bayou from W. Tidwell to FM 1960, spanning approximately 12.6 miles.

  • Final design included:

    • 188 outfall pipes

    • Retaining walls in 3 specific reaches to minimize right-of-way (ROW) acquisition

  • Collaborated closely with HCFCD staff to:

    • Develop wall designs

    • Prepare preliminary construction cost estimates and schedules

  • Design timeline was expedited to meet an early construction start date

West Little York Detention Basin (formerly Langham Creek)
Harris County, Texas, HCFCD
EST. CONSTRUCTION COST: $3.5M

Project is located in northwestern Harris County, north of W. Little York Road and west of Hwy 6 along Langham Creek. Project area consists of 3 tracts: Cell #1 north of Langham Creek, Cell #2 south of Langham Creek, and Cell #3 south of Langham Creek to the east. The goal of the project is to excavate as much as possible within the 3 cells for use as storage. Project includes design, bidding, & construction phase services.