Harris County Toll Road Authority Contract 126
Client: Harris County Toll Road Authority
Improvements to the Westpark Tollway between Dairy Ashford Road and the Sam Houston Tollway , and the Sam Houston Tollway between IH-10W and US-59, including new tolled ramp construction, pump station repairs, bridge and approach slab joint sealing, converting an existing ramp Plaza, and signage and pavement markings – Precinct 3
- Cook Road Ramp – Construction of new Westpark Tollway existing Ramp with EZTAG tolling system. Project also includes storm drain structures and signalization at Cook Road intersection.
- Deerwood Exit – Project includes conversion of manual tolling plaza to EZTAG.
- Val Verdi – Project includes replacement of outfall riprap washout after water pressure release from the Val Verdi pump station. Work consists of removal of the riprap debris and replacement with a baffle riprap design.
- Section E5 – Replacement of existing deteriorated box culverts. Project includes addition of storm sewer inlets and grading of channel.